Ductile iron pipe installation steps

2013-11-26


Ductile iron pipe in the city applied to everyone's approval, because it is not affected by temperature and geology, it can be used in many fields. Today small steps take you through the installation of cast-iron pipe.
First, choose a location to install. Because the city's pipeline and the pipeline route is more complex, so when the first exploration well installation route to install. Followed by the laying of pipelines. Before laying the pipe arrangements need to use the equipment and labor, and to determine the length of the t type di pipe into the well when carried cut pipe, cut in the shape of the desired good. To ensure the quality and speed of installation, to advance to the tube body measurements is good, and advance positioning marking.
Finally, the pipeline to be installed during the installation level, in order to ensure debris does not enter the pipeline at the time of installation you want to spout blocked.